| 1. | Photovoltaic stand - alone systems - design verification 光电独立系统.设计检定 |
| 2. | Photovoltaic stand alone systems - design verification 光电独立系统.设计检定 |
| 3. | Design and design verification tests for fire department ground ladders 消防部门地面梯的设计及设计验证试验 |
| 4. | The wildly use of verification languages will raise the efficiency and quality of design verification 高级验证语言的普及与使用必将提高芯片验证的效率与质量。 |
| 5. | Design verifications shall be done for any new components or design by review of alternative calculations and relevant test operations such as hydrostatic and functional tests 任何新零件的设计确认都将进行变换方法计算和相关的测试操作,如液压试验和功能测试。 |
| 6. | At the present time , about 70 % of design effort is dedicated to the function verification , while design verification takes more than half of the whole verification works 其中,保证设计功能正确是最基本的一项要求。目前功能验证已占整个设计资源的70 %左右,而设计验证则占据验证工作的绝大部分。 |
| 7. | Then , the design verification on virtual simulation platform and target board are executed individually , the methods and process of verification are discussed , the probable problems are notified , and the results are analyzed 接着在虚拟仿真平台和目标板上分别进行了设计验证,讨论了验证方法、验证过程和其中需要注意的问题,并分析了验证结果。 |
| 8. | Design verification is very important but most cost in the soc design flow . verificating the consistency of the implementation with design specification is the main function of the design verification 设计验证是集成电路( ic : integratedcircuit )设计中不可或缺的重要组成部分,主要用于判别设计规范和设计实现之间是否保持一致,已成为集成电路整个设计流程中开销最大的工作。 |
| 9. | At the time of design , the measurement of dispersion and interaction impedance will be used as design verification and improvement . at the time of manufacture , the measurement will find the problems of the slow - wave structures in machining , weld and fitting 在管子研制阶段,对色散和耦合阻抗冷参量的测量可以起到验证、改进设计的作用;在管子生产阶段,通过测量可以及早发现慢波结构在加工、焊接、装配过程中的问题,防止瑕疵品继续流水作业,提高生产效率。 |
| 10. | Design verification problem needs hierarchy methodology . because the effect of interconnection has taken in the highest flight , design verification for the interconnection network , for example , only the completed verification for performance of power supply of p / g network can ensure the reliability of chip 由于芯片内互连线作用已占相当重要的地位,在对互连线网络作精确的设计验证,例如,芯片电源地网的供电性能的验证,是芯片工作的可靠性的保证。 |